Nuru DRC

Active · Congo, Democratic Republic of

Source: International Finance Corporation (IFC)

The proposed investment is up to US$5 million redeemable preferred equity investment in Congo Energy Solutions Limited (“CESL” or “Nuru” or “the Company”), a Mauritius holding company, to finance the development and construction of up to 15 MW of solar-hybrid mini-grid projects in Democratic Republic of Congo (DRC) (“the Project”). Nuru was founded in August 2015 as Kivu Green Energy SARL (“KGE”).

Status
Prospective
Sector
Water Supply and Storage, Education, Solar, Waste Processing and Treatment, Energy Storage, Power Transmission, Telecommunications, Raw Materials, Warehouse, Power Generation (CCGT), Residential, Commercial, Government
Location
Democratic Republic of the Congo
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Nuru DRC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Nuru DRC” is an infrastructure initiative in the Water Supply and Storage sector, located in Congo, Democratic Republic of. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed investment is up to US$5 million redeemable preferred equity investment in Congo Energy Solutions Limited (“CESL” or “Nuru” or “the Company”), a Mauritius holding company, to finance the development and construction of up to 15 MW of solar-hybrid mini-grid projects in Democratic Republic of Congo (DRC) (“the Project”). Nuru was founded in August 2015 as Kivu Green Energy SARL (“KGE”). Nuru has its headquarters in Goma and an office in Beni, DRC, Nuru has developed, built, and commissioned threeprojects to date: 35 kW non-commercial solar hybrid pilot: Operational since November 2016, this is a solar photo-voltaic (PV)/lead-acid storage system that provides 24/7 electricity to the campus of non-profit Christian Bilingual University of Congo.. 55kW commercial pilot solar hybrid: Operational since July 2017, this is the first commercial solar mini-grid project in DRC and provides power to Beni. The plant combines a 55kWp PV plant, 26kW/120kWh of storage capacity (with lead-acid battery) and 60kW of diesel genset. The system offers 10 hours of service while a diesel backup generator provides 4 hours of service.  1.3 MW Goma 1 solar mini-grid project: Operational since 2020, The project is the largest solar mini-grid in DRC and one of the largest in Africa. It is located south-west of Goma, DRC. Clients of this project include water pumping stations, telecom towers, gas stations and clustered milling stations. Nuru expects other small and medium enterprise (SME) and household clients.   Nuru also owns and operates its transmission network (from each plant) and its distribution network to customers. This typically includes 11 kV and 33 kV overhead lines.  Nuru’s near-term pipeline of mini-grid projects includes: (a)   3.7 MW solar project in Goma (referred to as “Goma-II”): The project is being developed on a land plot of 4.5 hectares (ha), which was owned by private individuals. The expected start dates of construction and operation are June 2023 and December 2023, respectively. (b)   2 MW solar project in Kindu (referred to as “Kindu”): the project is being developed on a land plot of 7.0 hectares (ha), which was owned by a non-governmental organization (NGO) and a private individual. The expected start dates of construction and operation are June 2023 and June 2024, respectively. (c)   8 MW solar project in Bunia (referred to as “Bunia”): the project is being developed on a land plot of 25 hectares (ha), which was owned by a private company. The expected start dates of construction and operation are June 2023 and June 2024, respectively. The mini-grids are disconnected from any public grid and will operate on an independent basis. These projects are expected to provide relatively more affordable and reliable electricity to 28,000 households and businesses in DRC that currently have expensive, unreliable or no access to electricity. Nuru is at different stages of discussions with three main classes of off-takers: (i) Telecom, (ii) water pumping stations and substations; and (iii) agri-processing and milling companies. Nuru is also in talks with smaller off takers – national banks, construction materials industries and water bottling factories. The projects will be 100% owned by Nuru. Nuru will construct and operate the Project through Nuru SARL, its wholly-owned DRC-domiciled and focused subsidiary that currently owns and operates the 1.3 MW Goma mini-grid project mentioned above. The company is still in the process of appointing the engineering procurement and construction (EPC) contractor. The operation and maintenance (O&M) for these projects will be managed by Nuru. The distribution network will be medium voltage - 11 kV line for Goma and 33 kV lines for Kindu and Bunia.

Original sector

V-EB - Rural Electrification

Location

Country

Democratic Republic of the Congo (DRC)

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Education, Solar, Waste Processing and Treatment, Energy Storage, Power Transmission, Telecommunications, Raw Materials, Warehouse, Power Generation (CCGT), Residential, Commercial, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project