NV/DOT : SR 376 Culvert Replacements
Sector: Water Supply and Storage • Location: Tonopah, Nevada, United States of America
Source: Dodge USA
mitigate flood hazard and roadway overtopping with new culvert construction, replace/rehab failing culverts, addition of scour outlet protection and slope stabilization, and reprofile roadway to accommodate culverts NY 11.00 to NY 34.00
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Tonopah, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NV/DOT : SR 376 Culvert Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | mitigate flood hazard and roadway overtopping with new culvert construction, replace/rehab failing culverts, addition of scour outlet protection and slope stabilization, and reprofile roadway to accommodate culverts NY 11.00 to NY 34.00 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Tonopah |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
