NV/DOT: Hillview Drive Pavement Preservation
Sector: Water Supply and Storage • Location: Carson City, Nevada, United States of America
Source: Dodge
Crack Sealing: Fill and seal cracks in the existing pavement to prevent water infiltration and further deterioration. Asphalt Overlay: Apply a new layer of asphalt over the existing pavement to restore surface quality and extend the lifespan of the road. Chip Sealing: Add a layer of asphalt emulsion followed by a layer of aggregate to enhance traction and protect the underlying pavement. Microsurf
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Manufacturing (Industrial), Commercial
- Location
- Carson City, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NV/DOT: Hillview Drive Pavement Preservation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Crack Sealing: Fill and seal cracks in the existing pavement to prevent water infiltration and further deterioration. Asphalt Overlay: Apply a new layer of asphalt over the existing pavement to restore surface quality and extend the lifespan of the road. Chip Sealing: Add a layer of asphalt emulsion followed by a layer of aggregate to enhance traction and protect the underlying pavement. Microsurfacing: Apply a thin protective layer of asphalt emulsion, aggregate, and other additives to impro... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Carson City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Manufacturing (Industrial), Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
