NV/DOT: SR 562 Bituminous Surface Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
SR 562, CLARK COUNTY, FROM LAS VEGAS BLVD TO ANNIE OAKLEY DR; MP CL 25.35 TO MP CL 28.52. SR 171 FROM I 215 TO ENTRANCE OF AIRPORT TUNNEL (SOUTHBOUND ONLY); MP CL 0.00 TO MP CL 0.64 . ON SR 562, 2-3/4 INCH COLDMILL WITH 2 INCH PLANTMIX BITUMINOUS SURFACE WITH OPEN GRADED SURFACE. ON SR 171, NEX-GEN GROOVE AND GRIND (SOUTHBOUND ONLY)
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Tunnel, Airport
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NV/DOT: SR 562 Bituminous Surface Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SR 562, CLARK COUNTY, FROM LAS VEGAS BLVD TO ANNIE OAKLEY DR; MP CL 25.35 TO MP CL 28.52. SR 171 FROM I 215 TO ENTRANCE OF AIRPORT TUNNEL (SOUTHBOUND ONLY); MP CL 0.00 TO MP CL 0.64 . ON SR 562, 2-3/4 INCH COLDMILL WITH 2 INCH PLANTMIX BITUMINOUS SURFACE WITH OPEN GRADED SURFACE. ON SR 171, NEX-GEN GROOVE AND GRIND (SOUTHBOUND ONLY) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Tunnel, Airport |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
