NVTA Office Tenant Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
To provide interior renovation work to existing office space on the first and second floor of the Soscol Gateway Transit Center located in Napa, California. The WORK includes: selective demolition concrete forming and reinforcement miscellaneous metal fabrications and framing rough carpentry and architecture woodwork thermal and moisture protection acoustical ceilings and finishes signage toilet a
- Status
- Under Construction
- Sector
- Geothermal, Metal, Cement, Government, Residential, Manufacturing (Industrial), Commercial
- Location
- Napa, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NVTA Office Tenant Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To provide interior renovation work to existing office space on the first and second floor of the Soscol Gateway Transit Center located in Napa, California. The WORK includes: selective demolition concrete forming and reinforcement miscellaneous metal fabrications and framing rough carpentry and architecture woodwork thermal and moisture protection acoustical ceilings and finishes signage toilet and shower facilities plumbing window treatments office furnishings fire suppression heating, vent... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Napa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Geothermal, Metal, Cement, Government, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in United States of America
- SOLAR THERMAL INSTALLATION, EVACUATED SOLAR COLLECTOR TUBES AND 950 LITER BUFFER TANK
- The Music Center at Strathmore
- National Museum of the American Indian
- Waterfront Station
- Wheaton Revitalization Project
- Polk Street Resurfacing & Sidewalk
- Primary and Secondary Calibration on Active Layer (PASCAL)
- Industrial Efficiency and Decarbonization Office (IEDO) FY23 Multi-Topic FOA
