NVTA Office Tenant Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
To provide interior renovation work to existing office space on the first and second floor of the Soscol Gateway Transit Center located in Napa, California. The WORK includes: selective demolition concrete forming and reinforcement miscellaneous metal fabrications and framing rough carpentry and architecture woodwork thermal and moisture protection acoustical ceilings and finishes signage toilet a
- Status
- Closed
- Sector
- Metal, Geothermal, Cement, Government, Manufacturing (Industrial), Commercial, Residential
- Location
- Napa, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NVTA Office Tenant Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To provide interior renovation work to existing office space on the first and second floor of the Soscol Gateway Transit Center located in Napa, California. The WORK includes: selective demolition concrete forming and reinforcement miscellaneous metal fabrications and framing rough carpentry and architecture woodwork thermal and moisture protection acoustical ceilings and finishes signage toilet and shower facilities plumbing window treatments office furnishings fire suppression heating, vent... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Napa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Geothermal, Cement, Government, Manufacturing (Industrial), Commercial, Residential |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
