NW 3rd Street Complete Street Project
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project will increase multimodal capacity of the street by adding on-street parking on both sides of the road, 7-foot-wide buffered bike lanes, and 7-foot-wide sidewalks. It will improve the safety and mobility of this stretch of NW 3rd Street from Dixie Highway to NW 5th Terrace by access control, revised lane configurations, traffic calming, and other means.
- Status
- Prospective
- Sector
- Government, Road, Car parking, Commercial, Automotive
- Location
- Hallandale Beach, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NW 3rd Street Complete Street Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project will increase multimodal capacity of the street by adding on-street parking on both sides of the road, 7-foot-wide buffered bike lanes, and 7-foot-wide sidewalks. It will improve the safety and mobility of this stretch of NW 3rd Street from Dixie Highway to NW 5th Terrace by access control, revised lane configurations, traffic calming, and other means. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Hallandale Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Road, Car parking, Commercial, Automotive |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
