logo

Nw Despain Avenue Reconstruction

Sector: Oil and Gas • Location: Pendleton, Oregon, United States of America

Source: Dodge USA

Project
Closed

Work to be performed shall include the removal and replacement of approximately 2,670 LF of City standard curb and gutter, 559 SY of sidewalk and driveway approaches, 1,200 tons of asphalt, 2,160 LF of water main, 780 LF of storm drain pipe, catch basins, manholes, and other associated work. The HMAC for this Project shall be 1/2-inch Dense Level 3 with PG 64-28 grade oil. HMAC shall be placed in

Status
Closed
Sector
Oil and Gas, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Commercial
Location
Pendleton, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Nw Despain Avenue Reconstruction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Nw Despain Avenue Reconstruction” is an infrastructure initiative in the Oil and Gas sector, located in Pendleton, Oregon, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work to be performed shall include the removal and replacement of approximately 2,670 LF of City standard curb and gutter, 559 SY of sidewalk and driveway approaches, 1,200 tons of asphalt, 2,160 LF of water main, 780 LF of storm drain pipe, catch basins, manholes, and other associated work. The HMAC for this Project shall be 1/2-inch Dense Level 3 with PG 64-28 grade oil. HMAC shall be placed in 2 2-inch lifts for reconstructions.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Pendleton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Oil and Gas, Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Government, Automotive, Commercial

Article published date

2024-04-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project