NW District Bridge Removal
Sector: Bridge • Location: Chillicothe, Missouri, United States of America
Source: Dodge USA
The proposed work includes the removal of the existing bridge and construction of a 51 feet long x 24 feet wide 21 concrete deck girder bridge with w-beam rails that is supported by reinforced concrete abutments on galvanized HP 12x53 piles, and other required appurtenances. Bridge No. 43900161
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed work includes the removal of the existing bridge and construction of a 51 feet long x 24 feet wide 21 concrete deck girder bridge with w-beam rails that is supported by reinforced concrete abutments on galvanized HP 12x53 piles, and other required appurtenances. Bridge No. 43900161 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
