NW Sandy Cove Park Rivertrail
Sector: Water Supply and Storage • Location: Snoqualmie, Washington, United States of America
Source: Dodge
The work consists of providing a surfaced pedestrian trail, clear span pedestrian crossings over wetlands, stormwater measures, mitigation plantings and invasive removal on the east side of SR202 between the road and Snoqualmie River, The work also includes construction including regrading, tree removal for on-site salvage, critical area signage, and coordinated connection to the Town Center Phase
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Government, Commercial, Rail, Waste Processing and Treatment, Road, Car parking, Automotive
- Location
- Snoqualmie, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NW Sandy Cove Park Rivertrail
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of providing a surfaced pedestrian trail, clear span pedestrian crossings over wetlands, stormwater measures, mitigation plantings and invasive removal on the east side of SR202 between the road and Snoqualmie River, The work also includes construction including regrading, tree removal for on-site salvage, critical area signage, and coordinated connection to the Town Center Phase 8 project on west side of SR202. The City of Snoqualmie may be seeking a consultant to provide p... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Snoqualmie |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Government, Commercial, Rail, Waste Processing and Treatment, Road, Car parking, Automotive |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
