NW Ward 5 Water Main Improvement
Sector: Car parking • Location: Bradenton, Florida, United States of America
Source: Dodge USA
The Work is generally described as construction of approximately 3900 linear feet of 8-inch PVC water main by open cut method, including valves, fittings, fire hydrants, new water services to existing meters, trench asphalt pavement removal and replacement, abandonment of existing water mains, disinfection, testing, and other appurtenances and materials; and sidewalk and curbing removal and replac
- Status
- Closed
- Sector
- Car parking, Road, Water Supply and Storage, Automotive, Government, Commercial
- Location
- Bradenton, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NW Ward 5 Water Main Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work is generally described as construction of approximately 3900 linear feet of 8-inch PVC water main by open cut method, including valves, fittings, fire hydrants, new water services to existing meters, trench asphalt pavement removal and replacement, abandonment of existing water mains, disinfection, testing, and other appurtenances and materials; and sidewalk and curbing removal and replacement, as required for a complete and operable system. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Bradenton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Water Supply and Storage, Automotive, Government, Commercial |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
