logo

NWCC School Aeronautics Utilities Construction

Sector: Water Supply and Storage • Location: Batesville, Mississippi, United States of America

Source: Dodge

Project
Bid Results

The scope of work for the utility package consists of extending sanitary sewer, water, and gas utility services to School of Aeronautics. Plans call for approximately 800 LF of sewer pipe with associated manholes, approximately 1000 LF of water pipe with associated hydrants and fittings, and approximately 400 LF of gas pipe installation.

Status
Closed
Sector
Water Supply and Storage, Government, Oil and Gas, Chemical (Industrial), Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT)
Location
Batesville, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about NWCC School Aeronautics Utilities Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NWCC School Aeronautics Utilities Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Batesville, Mississippi, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The scope of work for the utility package consists of extending sanitary sewer, water, and gas utility services to School of Aeronautics. Plans call for approximately 800 LF of sewer pipe with associated manholes, approximately 1000 LF of water pipe with associated hydrants and fittings, and approximately 400 LF of gas pipe installation.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Batesville

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Oil and Gas, Chemical (Industrial), Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT)

Article published date

2025-01-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project