NWFE Electricity Grid Reinforcement
One of 5,002 projects Taiyo tracks in Egypt.
Source: European Bank for Reconstruction and Development (EBRD)
Provision of a sovereign loan of up to EUR 165 million to the Arab Republic of Egypt, to be on-lent to the state-owned Egyptian Electricity Transmission Company ("EETC"), to finance the upgrade and reinforcement of the electricity transmission grid in Egypt.
The proceeds of the loan will be used to finance (i) the upgrade of a 500 kV substation in the Cairo governorate in Egypt that is crucial fo
- Status
- Prospective
- Sector
- Water Supply and Storage, Wind, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government
- Location
- Egypt
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about NWFE Electricity Grid Reinforcement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Provision of a sovereign loan of up to EUR 165 million to the Arab Republic of Egypt, to be on-lent to the state-owned Egyptian Electricity Transmission Company ("EETC"), to finance the upgrade and reinforcement of the electricity transmission grid in Egypt. The proceeds of the loan will be used to finance (i) the upgrade of a 500 kV substation in the Cairo governorate in Egypt that is crucial for the stability of the network and is directly linked to the closing of a gas-powered power plant (Shoubra El Kheima) under the Energy Pillar of Egypt's Nexus Water, Food & Energy (NWFE) initiative, and (ii) the construction of a 200 km high-voltage overhead transmission line (OHL) that will relay c. 2.1 GW of renewable energy from the Gulf of Suez region, where several wind projects are currently under development or construction Download zip package in English Download zip package in Arabic Full ESIA documentation is available locally at: Egyptian Electricity Transmission Company Minister of Electricity and Renewable Energy Building New Administrative Capital, Cairo Arab Republic of Egypt And EBRD Resident Office in Cairo EGID Building, First Floor, Block 72, off Ninety Axis, 5th Settlement, New Cairo, Cairo, Egypt Dr Tamer Khattab General inquiries: t.khattab.eetc@moere.gov.eg E&S inquiries: environics@environics.com +201092662455 +20226841153 |
Original sector | Energy |
Budget |
Location
Country | Egypt |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Wind, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
