NWRF Actiflow Refurbishment Treatment Plant REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The contractor shall be responsible for the complete rehabilitation work on the existing ACTIFLO train(s). This includes the installation of gearboxes, pumps, motors, instrumentation, chemical feed systems, spare parts, or otherwise for the existing ACTIFLO Package Plant(s) as manufactured by Veolia Water Technologies.
- Status
- Prospective
- Sector
- Chemical (Industrial), Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Rail, Commercial, Government
- Location
- Sanford, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NWRF Actiflow Refurbishment Treatment Plant REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractor shall be responsible for the complete rehabilitation work on the existing ACTIFLO train(s). This includes the installation of gearboxes, pumps, motors, instrumentation, chemical feed systems, spare parts, or otherwise for the existing ACTIFLO Package Plant(s) as manufactured by Veolia Water Technologies. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Sanford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Rail, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- William Pond Chemical Toilet Replacement
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- State-Based Public Health Laboratory Biomonitoring Programs
