NY Route 146 Sidewalk Improvement
Sector: Car parking • Location: Clifton Park, New York, United States of America
Source: Dodge USA
This project includes construction of a sidewalk beginning at the intersection of NY Route 146 and Northcrest Drive at the existing crosswalk. The path travels east along the north side of NY Route 146 to the intersection with Tallow Wood Drive, where it joins the existing sidewalk. The path then resumes just past the intersection of NY Route 146 and the Executive Woods entrance. The pat terminate
- Status
- Closed
- Sector
- Car parking, Road, Automotive, Government, Commercial
- Location
- Clifton Park, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NY Route 146 Sidewalk Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes construction of a sidewalk beginning at the intersection of NY Route 146 and Northcrest Drive at the existing crosswalk. The path travels east along the north side of NY Route 146 to the intersection with Tallow Wood Drive, where it joins the existing sidewalk. The path then resumes just past the intersection of NY Route 146 and the Executive Woods entrance. The pat terminates at the intersection of NY Route 146 and Maxwell Drive |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Clifton Park |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
