logo

Nyadi Hydropower Plant

Sector: Hydro • Location: Four, Nepal

Source: World Bank Group

Project
Active

The project involves the construction of a run - of - the river power plant at Nyadi River, Bahundada, Lamjung District. The total capacity of the plant will be 30-MW.

Nyadi Hydropower Limited, which is a joint venture between Butwal Power Company (BPC) and Lamjung Electricity Development Company (LEDCO), is developing the project. The former holds slightly more than 97 per cent, and the latter

Project Information FAQ

Project Information

5 Q
The project “Nyadi Hydropower Plant” is an infrastructure initiative in the Hydro sector, located in Four, Nepal. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the construction of a run - of - the river power plant at Nyadi River, Bahundada, Lamjung District. The total capacity of the plant will be 30-MW. Nyadi Hydropower Limited, which is a joint venture between Butwal Power Company (BPC) and Lamjung Electricity Development Company (LEDCO), is developing the project. The former holds slightly more than 97 per cent, and the latter around 3 per cent ownership in the project company. An estimated 172 million units of electricity generated from the project annually will be sold to Nepal Electricity Authority (NEA), according to the power purchase agreement signed between project developer and state owned power utility. As per the agreement, the purchase rate will rise by 3 per cent per annum for eight years. The PPA period is of 30 years. A consortium led by Everest Bank and co-led by Nabil Bank and Global IME Bank will be financing the project. Himalayan Bank, Sunrise Bank and state- owned Hydroelectricity Investment and Development Company are also part of the consortium. Sources reported that Rs 4.4 billion will be provided by the lenders, with the remaining Rs 1.6 billion being funded by sponsors. The project is being built at an estimated cost of Rs 6 billion, according to the developer and is expected to go online by April 2020. Financial closure is estimated as per the commencement of construction on 23rd March 2017, after having secured funding from banks. http://www.nepalenergyforum.com/construction-of-30-mw-nyadi-hydropower-to-begin-within-two-months/ http://www.hydroworld.com/articles/2017/03/construction-begins-on-30-mw-nyadi-hydropower-project-in-nepal.html

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data