NY/DOT: Concrete Superstructure Replacement
Planning schematics · New York · Last reported Dec 2023
Source: Dodge USA
This reconstruction project replaces the current superstructure and concrete substructures of the bridge carrying Route 23 over the Unadilla River. Repairs are also made to the stream banks to prevent further erosion. Towns of Butternuts, Morris and New Berlin. Chenango and Otsego Counties.
- Status
- Prospective
- Sector
- Bridge, Cement, Road, Commercial
- Location
- Oneonta, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NY/DOT: Concrete Superstructure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This reconstruction project replaces the current superstructure and concrete substructures of the bridge carrying Route 23 over the Unadilla River. Repairs are also made to the stream banks to prevent further erosion. Towns of Butternuts, Morris and New Berlin. Chenango and Otsego Counties. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Oneonta |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Cement, Road, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
