NY/DOT: I-95 Bridge Improvements
Sector: Cement • Location: New York, United States of America
Source: Dodge
This rehabilitation project will replace the concrete deck of four GW bridges over I-95 in the Borough of New York, replace approach slabs, deck joints, bearings, and pedestals. Structural steel painting and substructure repairs are also included. The objective of the project is to correct the bridges' structural deficiencies, extend the service life of the bridges, reduce the life cycle maintenan
- Status
- Prospective
- Sector
- Cement, Steel, Commercial, Bridge, Road, Metal
- Location
- New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NY/DOT: I-95 Bridge Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This rehabilitation project will replace the concrete deck of four GW bridges over I-95 in the Borough of New York, replace approach slabs, deck joints, bearings, and pedestals. Structural steel painting and substructure repairs are also included. The objective of the project is to correct the bridges' structural deficiencies, extend the service life of the bridges, reduce the life cycle maintenance cost and ensure the safety of the traveling public. Project will need coordination with City p... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Steel, Commercial, Bridge, Road, Metal |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
