NY/DOT: Route 12B and Route 412 Pavement Rehabilitation
Sector: Water Supply and Storage • Location: Clinton, New York, United States of America
Source: Dodge
The proposed project will rehabilitate approximately 2.6 miles of Route 12B and the entirety of Route 412 in the village. An $8.8 million road rehabilitation project in Clinton, NY to restore road surfaces, add new sidewalks, and make other improvements to State Route 12B and State Route 412. The project includes pavement rehabilitation, new sidewalks, curb ramps, signage, a traffic signal, sewer
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive
- Location
- Clinton, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NY/DOT: Route 12B and Route 412 Pavement Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will rehabilitate approximately 2.6 miles of Route 12B and the entirety of Route 412 in the village. An $8.8 million road rehabilitation project in Clinton, NY to restore road surfaces, add new sidewalks, and make other improvements to State Route 12B and State Route 412. The project includes pavement rehabilitation, new sidewalks, curb ramps, signage, a traffic signal, sewer work, and hydrant upgrades. It aims to enhance safety and improve travel along these key roadways... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Clinton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Commercial, Car parking, Automotive |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
