NY/DOT: Rt. 5 Concrete Pavement Improvements
Sector: Water Supply and Storage • Location: Utica, New York, United States of America
Source: Dodge
This project will include1.95 miles of paving on the Rt. 5, 8, & 12 North South Arterial, beginning at the concrete pavement to the bridge over the NYS&W Railroad, and 11,000 feet of Ramp. This project will also address signs, minor drainage repairs, and minor guiderail repairs along this section of Rt. 5, 8, & 12 in the City of Utica, Oneida County. Rt. 5, 8, &12 Paving Project, City of Utica, On
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Mass Transit, Road, Bridge, Waste Processing and Treatment, Rail, Commercial
- Location
- Utica, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NY/DOT: Rt. 5 Concrete Pavement Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will include1.95 miles of paving on the Rt. 5, 8, & 12 North South Arterial, beginning at the concrete pavement to the bridge over the NYS&W Railroad, and 11,000 feet of Ramp. This project will also address signs, minor drainage repairs, and minor guiderail repairs along this section of Rt. 5, 8, & 12 in the City of Utica, Oneida County. Rt. 5, 8, &12 Paving Project, City of Utica, Oneida Co. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Utica |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Mass Transit, Road, Bridge, Waste Processing and Treatment, Rail, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
