logo
ProjectClosed

NY/DOT: US Route 9W Bridge Replacement

Closed · New York · Last reported Feb 2025

Source: Dodge

Bridge Replacement US Route 9W over CSX Railroad, Town of Bethlehem.

Status
Closed
Sector
Mass Transit, Bridge, Commercial, Rail, Road
Location
Selkirk, New York, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about NY/DOT: US Route 9W Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NY/DOT: US Route 9W Bridge Replacement” is an infrastructure initiative in the Mass Transit sector, located in Selkirk, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bridge Replacement US Route 9W over CSX Railroad, Town of Bethlehem.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Selkirk

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Mass Transit, Bridge, Commercial, Rail, Road

Article published date

2025-03-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project