logo

NYE 7 & 8 Conveyance Pipe Reroute

Sector: Water Supply and Storage • Location: Ventura, California, United States of America

Source: Dodge

Project
Closed

Engineering services for the installation of a PVC waterline from the Nye 7 & 8 Well sites located approximately 1,000 feet north of Foster Park to a point of connection in Casitas Vista Road just south of Foster Park. Project will include attaching the newly installed pipe on the bridges that span Coyote Creek and the Ventura River using steel or ductile iron pipe.

Status
Closed
Sector
Water Supply and Storage, Steel, Metal, Government, Car parking, Automotive, Road, Bridge, Waste Processing and Treatment, Commercial
Location
Ventura, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about NYE 7 & 8 Conveyance Pipe Reroute

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NYE 7 & 8 Conveyance Pipe Reroute” is an infrastructure initiative in the Water Supply and Storage sector, located in Ventura, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Engineering services for the installation of a PVC waterline from the Nye 7 & 8 Well sites located approximately 1,000 feet north of Foster Park to a point of connection in Casitas Vista Road just south of Foster Park. Project will include attaching the newly installed pipe on the bridges that span Coyote Creek and the Ventura River using steel or ductile iron pipe.

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Ventura

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Metal, Government, Car parking, Automotive, Road, Bridge, Waste Processing and Treatment, Commercial

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project