Nyngan Solar Plant New South Wales

Source: Power Technology

Project

The Nyngan solar plant constructed at Nyngan New South Wales Australia is the largest solar power plant in the southern hemisphere The 102MW solar project was developed by AGL in conjunction with the 53MW Broken Hill Solar Project Construction works for the Nyngan solar plant began in January 2014 and operations commenced in July 2015 The project created approximately 300 jobs during the construct

Project Information FAQ

Project Information

5 Q
The project "Nyngan Solar Plant New South Wales" is an infrastructure initiative in the Advanced Electronics, Commercial, Government, Hospital, Hydro, Manufacturing (Industrial), Power Generation (CCGT), Stadium, Steel, Telecommunications, Water Supply and Storage, Hotel, Residential, Solar, Road, Metal sector, located in N/A, Australia. Taiyo aggregates data from Power Technology, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Nyngan solar plant constructed at Nyngan New South Wales Australia is the largest solar power plant in the southern hemisphere The 102MW solar project was developed by AGL in conjunction with the 53MW Broken Hill Solar Project Construction works for the Nyngan solar plant began in January 2014 and operations commenced in July 2015 The project created approximately 300 jobs during the construction phase however only two or three people are required to operate the plant The plant is expected to generate approximately 233000MWh of electricity a year which is sufficient to provide for approximately 33000 homes in New South Wales at an average consumption rate of 7MWh The project also reduces CO emissions by approximately 203000t a year The engineering procurement and construction EPC contract for the Nyngan solar power plant was awarded to First Solar which also supplied solar modules for the project and provides postcommissioning maintenance services for five years The plant was constructed approximately 10km west of Nyngan on a 460ha site of which the solar field itself covers 250ha The plant is expected to operate for 30 years The solar field comprises more than 135 million solar photovoltaic PV modules installed on steel frames supported by approximately 150000 steel posts First Solar supplied the advanced cadmium telluride CdTe thin film photovoltaic modules rated at 126MW and weighing 12kg each The CdTe modules are capable of producing the same amount of power produced by traditional crystalline modules while consuming a smaller amount of semiconductor material The modules were fixed at an angle of 25 The EPC contractor implemented an automated continuous manufacturing technology that transforms a sheet of glass into a complete solar module in approximately 25 hours The photovoltaic modules are designed to generate greater electricity without any emissions and waste production while also consuming less water The modules are connected to roughly 81 inverters via underground cables The direct current DC produced by the modules is converted into alternating current AC using inverters A 69033kV 14MVA transformer is installed in each 126MW array to convert the energy into reticulation voltage before transferring it to the switchgear installed in the switchyard at the site via the 33kV reticulation cables The switchgear is connected to the new 33132kV substation which feeds the power to the grid The electricity produced by the plant is sold to AGL Hydro Partnership a whollyowned subsidiary of AGL The Nyngan solar power plant features four sections of panels that were constructed one after the other The plant construction was completed in 18 months Initial works included the construction of temporary facilities including site sheds water supply systems wastewater system building access and perimeter roads A new substation featuring a 33kV132kV transformer was constructed at the site and a 132kV transmission line was laid from the substation and connected to the existing NynganCobar transmission line which runs approximately 3km south of the project site Workers were accommodated at the 300member camp constructed at the old hospital site on Hospital Road Nyngan A permanent operations and maintenance building covering a floor space of approximately 75m was also constructed at the site Neil Earthmoving was awarded the contract for constructing the access roads to the site on the Barrier Highway Consolidated Power Projects a company engaged in the construction of power transmission and distribution assets is the connection contractor for the project Allens advised the developer and the EPC contractor on their respective roles in the development of the project The Nyngan solar power project involved a 300m investment while the total investment for the two combined solar projects of AGL in New South Wales is 440m The projects were supported by commonwealth government funding through which the Australian Renewable Energy Agency ARENA provided 1667m and the New South Wales Government provided 649m Get industry leading news data and analysis delivered to your inbox

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data