NYSDOT: NYS RT 5 (Buffalo Skyway)
Sector: Water Supply and Storage • Location: Buffalo, New York, United States of America
Source: Dodge
Interchanges, approaches and infrastructure for approximately 3.5 miles from Tifft Street to Church Street. The work envisioned for this project will include the following features: Construction of a new 2.6 mile connector roadway to realign a section of NYS Route 5 from Tifft Street to I-190. Construction would include at-grade connections with Fuhrmann Boulevard and Ship Canal Parkway and grade
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Seaport, Car parking, Road, Commercial, Automotive
- Location
- Buffalo, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NYSDOT: NYS RT 5 (Buffalo Skyway)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interchanges, approaches and infrastructure for approximately 3.5 miles from Tifft Street to Church Street. The work envisioned for this project will include the following features: Construction of a new 2.6 mile connector roadway to realign a section of NYS Route 5 from Tifft Street to I-190. Construction would include at-grade connections with Fuhrmann Boulevard and Ship Canal Parkway and grade separated interchanges with Tifft Street, South Park Avenue and I-190 (near Exit 3) and include: ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Buffalo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Seaport, Car parking, Road, Commercial, Automotive |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
