Nyssa Library Remodel
One of 10,000+ projects Taiyo tracks in Oregon.
Source: Dodge USA
The Project includes the following Work: Install two new awnings over two entrance doors, replace existing City sidewalk, replace sidewalk on west side of library, replace part of existing parking lot to allow drainage to flow away from the building, and all surface restorations as specified in the plans and contract documents.
- Status
- Closed
- Sector
- Commercial, Car parking, Education, Government, Automotive, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Nyssa, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Nyssa Library Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Install two new awnings over two entrance doors, replace existing City sidewalk, replace sidewalk on west side of library, replace part of existing parking lot to allow drainage to flow away from the building, and all surface restorations as specified in the plans and contract documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Nyssa |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Education, Government, Automotive, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
