Oak Alley ADA Trail Improvements
Sector: Water Supply and Storage • Location: Topton, Pennsylvania, United States of America
Source: Dodge USA
The work includes but is not limited to all labor, materials, tools, oversight and permits required to remove existing vegetation, site furnishings and signage not conducive to the final design, sawcut and remove asphalt pavement, concrete curb and sidewalk for replacement, remove existing utilities for relocation and adjustment; and construct or install new concrete curb and sidewalk, ADA curb ra
- Status
- Closed
- Sector
- Water Supply and Storage, Consumer Products, Waste Processing and Treatment, Cement, Government, Power Transmission, Power Generation (CCGT), Road, Car parking, Commercial, Automotive
- Location
- Topton, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Oak Alley ADA Trail Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes but is not limited to all labor, materials, tools, oversight and permits required to remove existing vegetation, site furnishings and signage not conducive to the final design, sawcut and remove asphalt pavement, concrete curb and sidewalk for replacement, remove existing utilities for relocation and adjustment; and construct or install new concrete curb and sidewalk, ADA curb ramps, full depth pavement restoration, utility relocation and reset existing utilities to finish g... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Topton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Consumer Products, Waste Processing and Treatment, Cement, Government, Power Transmission, Power Generation (CCGT), Road, Car parking, Commercial, Automotive |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
