Oak Creek Southwest MIS Extension
Sector: Water Supply and Storage • Location: Wisconsin, United States of America
Source: Dodge USA
Engineering services for Oak Creek Southwest MIS Extension. The new metropolitan interceptor sewer (MIS) will provide sanitary service to the farthest portions of the both the City of Franklin and the City of Oak Creek and will be available for future potential SSSA extension in Racine County. The project scope includes the design and construction of a new Metropolitan Interceptor Sewer (MIS) in S
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials
- Location
- Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Oak Creek Southwest MIS Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering services for Oak Creek Southwest MIS Extension. The new metropolitan interceptor sewer (MIS) will provide sanitary service to the farthest portions of the both the City of Franklin and the City of Oak Creek and will be available for future potential SSSA extension in Racine County. The project scope includes the design and construction of a new Metropolitan Interceptor Sewer (MIS) in S 27th Street, from the end of the existing MIS at W. Oakwood Road, south to the Racine County lin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
