Oak Forest Water Transmission Line Project
Sector: Road • Location: Oak Forest, Illinois, United States
Source: Patch
The project involves the construction of a new 36-inch water transmission line as part of the Village of Oak Lawn Regional Water System. It will include traffic shifts and delays as construction progresses along 159th Street and Central Avenue.
- Status
- Under Construction
- Sector
- Road, Water Supply and Storage
- Location
- Oak Forest, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about Oak Forest Water Transmission Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of a new 36-inch water transmission line as part of the Village of Oak Lawn Regional Water System. It will include traffic shifts and delays as construction progresses along 159th Street and Central Avenue. |
Original sector | Water |
Location
Country | United States of America (USA) |
State | Illinois |
City | Oak Forest |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage |
Article published date | 2025-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
