Oak Grove Private Sewer System Consolidation
Sector: Waste Processing and Treatment • Location: Greenville, South Carolina, United States of America
Source: Dodge
The project is located in the Oak Grove Mobile Home Park located at 41 Dixie Circle and 43 Dixie Circle in Greenville, SC 29605. The project is bounded on its northwestern side by Dixie Circle (SC 426), and on its eastern, southern, and western sides by the property limits of Oak Grove Mobile Home Park. This project is located approximately 250 linear feet west of the intersection of Evelyn Drive
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Water Supply and Storage, Automotive, Residential, Commercial, Government
- Location
- Greenville, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Oak Grove Private Sewer System Consolidation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located in the Oak Grove Mobile Home Park located at 41 Dixie Circle and 43 Dixie Circle in Greenville, SC 29605. The project is bounded on its northwestern side by Dixie Circle (SC 426), and on its eastern, southern, and western sides by the property limits of Oak Grove Mobile Home Park. This project is located approximately 250 linear feet west of the intersection of Evelyn Drive and Dixie Circle. Bidder will provide, furnish, and install all equipment, labor and materials re... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Greenville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Water Supply and Storage, Automotive, Residential, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
