Oak Run Solar Project Permit
The status, timeline and source of this project. A free account opens every field.
Source: Ohio Capital Journal
The Ohio Supreme Court overturned a permit previously granted to a massive, 6,000-acre industrial-scale solar farm and battery operation in Madison County, Ohio. The project is a significant setback but not necessarily a fatal blow to the facility, which would be located in rural farmland between Columbus and Dayton.
- Status
- Prospective
- Sector
- Energy Storage, Solar, Manufacturing (Industrial), Raw Materials
- Location
- Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Ohio Capital Journal
ConstructChat
Ask ConstructChat about Oak Run Solar Project Permit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | permit overturned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ohio Supreme Court overturned a permit previously granted to a massive, 6,000-acre industrial-scale solar farm and battery operation in Madison County, Ohio. The project is a significant setback but not necessarily a fatal blow to the facility, which would be located in rural farmland between Columbus and Dayton. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Ohio |
Source
Source | Ohio Capital Journal |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Solar, Manufacturing (Industrial), Raw Materials |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
