Oak Street Quick-Build Project
Sector: Automotive • Location: San Francisco, California, United States of America
Source: SFMTA Projects
Oak Street Quick-Build Project Share this: Facebook Twitter LinkedIn Project Introduction The Oak Street Quick-Build Project aims to improve safety and access for people walking and bicycling on Oak Street (between Stanyan Street and Baker Street) and JFK Drive (between Kezar Drive and Stanyan Street) and provide a new connection between Golden Gate Park’s JFK Promenade and the popular Wiggle bike
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Oak Street Quick-Build Project Share this: Facebook Twitter LinkedIn Project Introduction The Oak Street Quick-Build Project aims to improve safety and access for people walking and bicycling on Oak Street (between Stanyan Street and Baker Street) and JFK Drive (between Kezar Drive and Stanyan Street) and provide a new connection between Golden Gate Park’s JFK Promenade and the popular Wiggle bike route. This project supports the implementation of the goals and priorities of the SFMTA Strategic Plan and supports San Francisco’s Vision Zero initiative. It is coordinated with several adjacent projects, including the Lyon Slow Street and SFPUC Panhandle and Inner Sunset Large Sewer Rehabilitation Project . Goals and Objectives The SFMTA’s initial goals and objectives for this project include the following, but may be modified based on the results of the planning and outreach phases: Upgrade pedestrian crossings and access to the Panhandle for people walking and bicycling from the Haight Ashbury-Neighborhood Add a physically-protected eastbound bikeway connecting the JFK Drive Promenade with the existing Oak Street protected bike lane at Baker Street Improve connections to and from Golden Gate Park for people bicycling on JFK Drive, including modifications at the Kezar Drive and Stanyan Street intersections Reduce vehicle speeds while keeping traffic moving, thereby reducing the likelihood of severe-injury collisions Address conflicts between those who walk, bike, and drive on the corridor Project Timeline Summer 2023 Conceptual Design Pending Fall - Winter 2023 Outreach Pending Spring 2024 Approvals Pending Summer 2024 Implementation of quick-build elements Pending Fall 2024 Evaluation Pending TBD Implementation of civil elements (eg. new signal at JFK/Kezar) Pending Neighborhoods Golden Gate Park Haight Ashbury What is a quick-build project? Quick-build projects focus on implementing safety improvements on streets identified on San Francisco's Vision Zero High-Injury Network .They include adjustable and reversible traffic safety improvements that SFMTA crews can install quickly. Unlike major capital projects that may take years to plan, design, bid, and construct, quick-build projects are buildable within weeks and months. They are intended to be evaluated and reviewed after implementation to inform adjustments and lessons for future projects. Typical quick-build type improvements include: Roadway paint, traffic delineators, and street signs Parking and loading (curb management) adjustments Traffic signal timing changes and small hardware modifications Background The Panhandle’s shared-use path is a high-quality off-street path shared by people walking and bicycling – a central piece of San Francisco’s active-transportation network. Though the number of peak-hour downtown commuters has dropped, it is still a busy crosstown route. When the path is less active, the difference in speed between users – particularly those walking and bicycling – is higher, resulting in more potential conflicts. Now that the JFK Drive Promenade car-free space has been made permanent and continues to be very popular, the project would provide additional active transportation space for those traveling to Golden Gate Park from neighborhoods across San Francisco and improve the connection between the Panhandle and Golden Gate Park. Neighbors in the surrounding area have expressed interest in studying adding on-street bicycle facilities adjacent to the Panhandle, to make the existing shared-use path more comfortable for a variety of users and to reduce motor vehicle speeds along Fell Street and Oak Street. Ideally, on-street bikeways would attract faster, travel-time-sensitive bike riders away from the multi-use path to create a safer experience for pedestrians and leisure riders. Curbside bike lanes were added in 2012 on Fell and Oak streets between Scott and Baker streets to improve connections between the Panhandle bike path and the Wiggle and the protected bikeway on Fell Street was extended to Shrader Street in 2020. Adding a protected bike facility adjacent to the Panhandle along Oak Street will give people bicycling a parallel eastbound option, completing the connection between Golden Gate Park and the Wiggle. An eastbound protected bikeway on Oak Street would reduce pressure on the Panhandle multi-use pathway. Along much of the project area, pedestrians need to cross four vehicle travel lanes to access the Panhandle. No bike lane exists on Oak Street today. Designing a new eastbound protected bikeway on Oak Street provides an opportunity to improve connections to and from Golden Gate Park. The design of protected bike lane on Oak Street will need to manage potential conflicts with the high volume of vehicles turning left from Oak onto Masonic Avenue. Contact Information Oak Street Quick-Build Project Team OakQB@SFMTA.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
