logo

Oakes Park Trunk Sewer Relining & Maintenance Hole rehabilitiation - Town of Fort Erie

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Project
Completed

The following are the main components of the project; • 1,265 meters of intercept sewer lining. The sewer diameter size 825mm diameter and crosses under one (1) artillery roadway and two (2) Town Parks • Rehabilitation of 19 maintenance holes The Oakes Park trunk sewer in the Town of Fort Erie carries all sanitary sewage from the communities of Crystal Beach and Ridgeway. This represents a populat

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Hydrogen, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Oakes Park Trunk Sewer Relining & Maintenance Hole rehabilitiation - Town of Fort Erie

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Oakes Park Trunk Sewer Relining & Maintenance Hole rehabilitiation - Town of Fort Erie” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The following are the main components of the project; • 1,265 meters of intercept sewer lining. The sewer diameter size 825mm diameter and crosses under one (1) artillery roadway and two (2) Town Parks • Rehabilitation of 19 maintenance holes The Oakes Park trunk sewer in the Town of Fort Erie carries all sanitary sewage from the communities of Crystal Beach and Ridgeway. This represents a population of over 7,100 plus industrial, commercial and institutional sewage generators. This trunk sewer has been in service since 1973 and now has extensive corrosion damage from hydrogen sulphide attack and must be relined/rehabilitated. The corrosion is extensive and immediate action is required to ensure system reliability. Innovative "Trenchless Technology" will be used to minimize disruption to the neighborhood including users of Oakes and Sugarbowl parks. This rehabilitation methodology (insertion of a glass reinforced plastic pipe liner) is typically lower in cost and is not only resistant to corrosion from hydrogen sulphide attack but will extend the sewers life by over 50 years. In addition it has the added benefit of a smaller carbon foot print when compared to traditional open-cut digging methods.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Hydrogen, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project