Oakes Park Trunk Sewer Relining & Maintenance Hole rehabilitiation - Town of Fort Erie
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The following are the main components of the project; 1,265 meters of intercept sewer lining. The sewer diameter size 825mm diameter and crosses under one (1) artillery roadway and two (2) Town Parks Rehabilitation of 19 maintenance holes The Oakes Park trunk sewer in the Town of Fort Erie carries all sanitary sewage from the communities of Crystal Beach and Ridgeway. This represents a populat
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Hydrogen, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Oakes Park Trunk Sewer Relining & Maintenance Hole rehabilitiation - Town of Fort Erie
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The following are the main components of the project; 1,265 meters of intercept sewer lining. The sewer diameter size 825mm diameter and crosses under one (1) artillery roadway and two (2) Town Parks Rehabilitation of 19 maintenance holes The Oakes Park trunk sewer in the Town of Fort Erie carries all sanitary sewage from the communities of Crystal Beach and Ridgeway. This represents a population of over 7,100 plus industrial, commercial and institutional sewage generators. This trunk sewer has been in service since 1973 and now has extensive corrosion damage from hydrogen sulphide attack and must be relined/rehabilitated. The corrosion is extensive and immediate action is required to ensure system reliability. Innovative "Trenchless Technology" will be used to minimize disruption to the neighborhood including users of Oakes and Sugarbowl parks. This rehabilitation methodology (insertion of a glass reinforced plastic pipe liner) is typically lower in cost and is not only resistant to corrosion from hydrogen sulphide attack but will extend the sewers life by over 50 years. In addition it has the added benefit of a smaller carbon foot print when compared to traditional open-cut digging methods. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Hydrogen, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
