Oakes Park Trunk Sewer Relining & Maintenance Hole rehabilitiation - Town of Fort Erie
Sector: Waste Processing and Treatment • Location: Ontario, Canada
Source: Infrastructure Canada
The following are the main components of the project; 1,265 meters of intercept sewer lining. The sewer diameter size 825mm diameter and crosses under one (1) artillery roadway and two (2) Town Parks Rehabilitation of 19 maintenance holes The Oakes Park trunk sewer in the Town of Fort Erie carries all sanitary sewage from the communities of Crystal Beach and Ridgeway. This represents a populat
- Status
- Closed
- Sector
- Waste Processing and Treatment, Hydrogen, Water Supply and Storage, Manufacturing (Industrial), Commercial
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Oakes Park Trunk Sewer Relining & Maintenance Hole rehabilitiation - Town of Fort Erie
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The following are the main components of the project; 1,265 meters of intercept sewer lining. The sewer diameter size 825mm diameter and crosses under one (1) artillery roadway and two (2) Town Parks Rehabilitation of 19 maintenance holes The Oakes Park trunk sewer in the Town of Fort Erie carries all sanitary sewage from the communities of Crystal Beach and Ridgeway. This represents a population of over 7,100 plus industrial, commercial and institutional sewage generators. This trunk sewer has been in service since 1973 and now has extensive corrosion damage from hydrogen sulphide attack and must be relined/rehabilitated. The corrosion is extensive and immediate action is required to ensure system reliability. Innovative "Trenchless Technology" will be used to minimize disruption to the neighborhood including users of Oakes and Sugarbowl parks. This rehabilitation methodology (insertion of a glass reinforced plastic pipe liner) is typically lower in cost and is not only resistant to corrosion from hydrogen sulphide attack but will extend the sewers life by over 50 years. In addition it has the added benefit of a smaller carbon foot print when compared to traditional open-cut digging methods. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Hydrogen, Water Supply and Storage, Manufacturing (Industrial), Commercial |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
