Oakley Woodard St Pavement Improvements
Closed · Michigan · Last reported Apr 2025
Source: Dodge
The Project consists of completing local street improvements by trench widening the road to 20' wide, pulverizing the existing roadway, HMA base stabilizing the pulverized road, and HMA paving. Woodard Street must be open to traffic for the harvest seasons, which are anticipated to be early July for wheat and beginning in September for dry beans. Coordination with the elevator should occur prior t
- Status
- Closed
- Sector
- Consumer Products, Government, Commercial, Manufacturing (Industrial), Road
- Location
- Oakley, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Oakley Woodard St Pavement Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of completing local street improvements by trench widening the road to 20' wide, pulverizing the existing roadway, HMA base stabilizing the pulverized road, and HMA paving. Woodard Street must be open to traffic for the harvest seasons, which are anticipated to be early July for wheat and beginning in September for dry beans. Coordination with the elevator should occur prior to work. Elevator contact information is included in the plans and specifications of this project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Oakley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Government, Commercial, Manufacturing (Industrial), Road |
Article published date | 2025-04-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
