Oakshire Elementary School Comprehensive Renovation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
cope of work consists of a campus wide multi-system renovation including sitework throughout the campus with approximately 118,000 SF of construction under roof on a 19.69 Acre site. Renovation includes but is not limited to: Temporary facilities, site utility locates, temp power & water, temporary access roads & parking areas, temporary fencing. Miscellaneous site demolition of temporary classroo
- Status
- Closed
- Sector
- Car parking, Road, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Education, Consumer Products, Cement, Government
- Location
- Orlando, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Oakshire Elementary School Comprehensive Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | sub bidding, construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | cope of work consists of a campus wide multi-system renovation including sitework throughout the campus with approximately 118,000 SF of construction under roof on a 19.69 Acre site. Renovation includes but is not limited to: Temporary facilities, site utility locates, temp power & water, temporary access roads & parking areas, temporary fencing. Miscellaneous site demolition of temporary classroom structures and MEP. Building selective interior demolition of furnishings, concrete floors, mas... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Orlando |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Water Supply and Storage, Power Transmission, Automotive, Power Generation (CCGT), Commercial, Education, Consumer Products, Cement, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
