The project involves development of two wind farms with a combined capacity of 197.4MW in Ramagiri, Kambadur and Kanaganapalli mandal of Anantpur district of Andhra Pradesh, India (the “project”). The project will be developed by two Special Purpose Vehicles (SPVs) namely Ostro A.P Wind Private Limited of 98.7 MW and Ostro Andhra Wind Private Limited of 98.7 MW (hereafter referred to as the “Compa
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Wind, Fertilizers, Power Transmission, Automotive, Road, Raw Materials, Residential, Commercial, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about OAWPL and OAPWPL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves development of two wind farms with a combined capacity of 197.4MW in Ramagiri, Kambadur and Kanaganapalli mandal of Anantpur district of Andhra Pradesh, India (the “project”). The project will be developed by two Special Purpose Vehicles (SPVs) namely Ostro A.P Wind Private Limited of 98.7 MW and Ostro Andhra Wind Private Limited of 98.7 MW (hereafter referred to as the “Company”). Both the SPVs are wholly owned subsidiaries of Ostro Energy Private Limited (hereafter referred to as “Ostro”). Ostro along with its subsidiaries is currently operating wind projects of a total capacity of 76 MW in the state of Rajasthan, and 325 MW is under construction in the states of Rajasthan, Andhra Pradesh and Madhya Pradesh, India. The project involves procurement, erection, testing, commissioning, operation and maintenance of 94 wind turbines, with a unit generating capacity of 2.1MW each to be supplied by Suzlon Energy (hereafter referred to as “Suzlon”).The companies have signed term sheet with Suzlon and finalization of a lump sum turnkey (LSTK) contract is under progress. The LSTK contract will include supply, erection and commissioning (“E&C”) of wind turbines. The SPVs will also sign a comprehensive O&M contract with Suzlon. The contract would also include land purchase, project approvals, construction of internal/access roads, SCADA building, turbine foundations, evacuation infrastructure, external & internal transmission lines and other associated civil works. The construction phase is expected to be 12 months. It will be a phased construction with full commissioning expected in/February-March 2017.Transformers will be located near the turbine within an access controlled area and will be connected to the overhead conductor at 33 kV which in turn will connect to the transformer at the pooling substation. A pooling substation with two 220/33 kV 63 MVA capacity power transformers will be constructed at Perur villageand will be used for the project. The turbines are located within a 10-15 km radius of this substation. It will be connected to the project site through eight feeder lines of 33 KV each with a carrying capacity of around 25MW or similar suitable combination. Power from the pooling station will be evacuated through a 37 km 220KV double circuit transmission line to Grid Sub-station (GSS) at Borampalli (220/132). The transmission line along with other associated facilities will be handed over to the state owned utility, Andhra Pradesh Power Transmission Company Limited (APPTCL), after construction.The project is spread across land belonging to eight villages in Ramagiri, Kambadur, Kanaganapalli mandal of Anantpur District of Andhra Pradesh. The nearest sensitive social receptor (habitation/school/temple) is located around 320-450 meters from the nearest wind turbine. Each turbine and associated transformer will be located in a land plot of approximately 3.0 Acres (1.21 ha). Additional land will be required for construction and maintenance period, like for use by cranes during both turbine installation and maintenance work, for access and internal roads, 33kv high tension line, site office, etc. The total estimated land area required for project is around 390 acres (158 ha) spread over non-contiguous parcels, including land for 94 wind turbines, pooling substation, transmission lines, access roads, internal lines, and a maintenance area amongst others. All land required for this project will be private land, which is being purchased on a willing buyer-willing seller basis. This land is predominantly, non-cultivated and open scrub land also used for grazing purposes with a mix of singly crop (rain fed) agricultural. There are three other renewable energy projects located in the general vicinity of the project site. Two of them are wind projects in Rayala (Greenko) and Nimbaglu (Ostro, Orange and Tata), located at a distance of about 22 kms and 50 kms respectively north east of the project site. A solar power project in Borampalli is located at a distance of approximately 26 kms from the proposed project site. |
Original sector | V-BC - Wind Power - Renewable Energy Generation |
Location
Country | India |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Wind, Fertilizers, Power Transmission, Automotive, Road, Raw Materials, Residential, Commercial, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project