logo

Obelisk Solar Plus Storage Project

Sector: Solar • Location: Egypt

Source: ZAWYA

Project
Under Construction

The Obelisk project is a 1.1 gigawatts (GW) solar and 100 MW / 200 MWh battery storage hybrid project in Egypt. It combines solar and battery storage to deliver stable and cost-competitive renewable energy to support Egypt's growing power demand and energy transition. The project has reached financial close and started construction in 2025.

Status
Under Construction
Sector
Solar, Energy Storage, Power Generation (CCGT)
Location
Egypt
Updated
22 Jul 2026
Source
ZAWYA

ConstructChat

Ask ConstructChat about Obelisk Solar Plus Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Obelisk Solar Plus Storage Project” is an infrastructure initiative in the Solar sector, located in Egypt. Taiyo aggregates data on it from ZAWYA.

Participants

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Obelisk project is a 1.1 gigawatts (GW) solar and 100 MW / 200 MWh battery storage hybrid project in Egypt. It combines solar and battery storage to deliver stable and cost-competitive renewable energy to support Egypt's growing power demand and energy transition. The project has reached financial close and started construction in 2025.

Original sector

Utilities

Budget

Location

Country

Egypt

Source

Source

ZAWYA

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Power Generation (CCGT)

Article published date

2025-12-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project