logo
ProjectUnder Construction

Obelisk Solar Power Project Phase 2

Under construction · Egypt · Last reported May 2026

Source: Business Today Egypt

The second phase of the 500-megawatt Obelisk solar power project in Nag Hammadi, set to be connected to the national grid during May 2026.

Status
Under Construction
Sector
Solar, Power Generation (CCGT)
Location
Nag Hammadi, Egypt
Updated
22 Jul 2026
Source
Business Today Egypt

ConstructChat

Ask ConstructChat about Obelisk Solar Power Project Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Obelisk Solar Power Project Phase 2” is an infrastructure initiative in the Solar sector, located in Nag Hammadi, Egypt. Taiyo aggregates data on it from Business Today Egypt.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The second phase of the 500-megawatt Obelisk solar power project in Nag Hammadi, set to be connected to the national grid during May 2026.

Original sector

Energy

Location

Country

Egypt

City

Nag Hammadi

Source

Source

Business Today Egypt

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2026-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project