Obelisk Solar Power Project Phase 2
Sector: Power Generation (CCGT) • Location: Nag Hammadi, Egypt
Source: Egypt Today
The second phase of the 500-megawatt Obelisk solar power project in Nag Hammadi, set to be connected to the national grid in May 2026.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Solar
- Location
- Nag Hammadi, Egypt
- Updated
- 22 Jul 2026
- Source
- Egypt Today
ConstructChat
Ask ConstructChat about Obelisk Solar Power Project Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The second phase of the 500-megawatt Obelisk solar power project in Nag Hammadi, set to be connected to the national grid in May 2026. |
Original sector | Energy |
Location
Country | Egypt |
City | Nag Hammadi |
Source
Source | Egypt Today |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar |
Article published date | 2026-05-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
