Obey River Sewer Line Replacement Phase II
Sector: Cement • Location: Byrdstown, Tennessee, United States of America
Source: Dodge USA
The work will include construction of the Obey River Campground Sewerline network which includes selective clearing, partial removal of the existing sewerline, trench excavation, pipe construction to include assembly and construction of all pertinent sewerline components, connection to the existing sewerline network, disposal of removed pipe, construction of septic tank and lift stations, construc
- Status
- Closed
- Sector
- Cement, Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
- Location
- Byrdstown, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Obey River Sewer Line Replacement Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work will include construction of the Obey River Campground Sewerline network which includes selective clearing, partial removal of the existing sewerline, trench excavation, pipe construction to include assembly and construction of all pertinent sewerline components, connection to the existing sewerline network, disposal of removed pipe, construction of septic tank and lift stations, construction of leach field and all pertinent components, minor concrete placement, electrical work, some... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Byrdstown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Water Supply and Storage, Waste Processing and Treatment, Commercial, Power Generation (CCGT) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
