logo
ProjectClosed

Obey River Sewer Line Replacement Phase II

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The work will include construction of the Obey River Campground Sewerline network which includes selective clearing, partial removal of the existing sewerline, trench excavation, pipe construction to include assembly and construction of all pertinent sewerline components, connection to the existing sewerline network, disposal of removed pipe, construction of septic tank and lift stations, construc

Status
Closed
Sector
Commercial, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment
Location
Byrdstown, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Obey River Sewer Line Replacement Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Obey River Sewer Line Replacement Phase II” is an infrastructure initiative in the Commercial sector, located in Byrdstown, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work will include construction of the Obey River Campground Sewerline network which includes selective clearing, partial removal of the existing sewerline, trench excavation, pipe construction to include assembly and construction of all pertinent sewerline components, connection to the existing sewerline network, disposal of removed pipe, construction of septic tank and lift stations, construction of leach field and all pertinent components, minor concrete placement, electrical work, some...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Byrdstown

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project