Ocean-Power Floating Gas-Fuelled Power Plants with CCS
Sector: Data Center
Source: Gas to Power Journal
Ocean-Power is positioning itself as a key energy supplier to the data center industry by offering floating gas-fuelled power plants equipped with post-combustion carbon capture and storage (CCS). These floating units have 200 – 250 MW power packs, generate electricity in combined-cycle mode, and capture CO2 which is then injected into a nearby geological formation or liquefied.
- Status
- Prospective
- Sector
- Data Center, Power Generation (CCGT)
- Updated
- 22 Jul 2026
- Source
- Gas to Power Journal
ConstructChat
Ask ConstructChat about Ocean-Power Floating Gas-Fuelled Power Plants with CCS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ocean-Power is positioning itself as a key energy supplier to the data center industry by offering floating gas-fuelled power plants equipped with post-combustion carbon capture and storage (CCS). These floating units have 200 – 250 MW power packs, generate electricity in combined-cycle mode, and capture CO2 which is then injected into a nearby geological formation or liquefied. |
Original sector | Energy |
Location
| Not available for this record. |
Source
Source | Gas to Power Journal |
URL |
More Details
Record type | Project |
Sector | Data Center, Power Generation (CCGT) |
Article published date | 2025-11-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Data Center projects
- Camrose City Hall
- CONSTRUCTION OF (N) 3-STORY, COLD SHELL DATA CENTER BUILDING W/ 257,610 SQ FT. OF BUILDING AREA
- PHASE 4-DATA CENTER-
- HAZARDOUS MATERIALS FOR DATA CENTER AND TRANSFORMER YARD
- PHASE 2-DATA CENTER- PART OF 3RD FLOOR AHU,ELECTRICAL ROOM, BATTERY ROOM.INSTALLATION GENERATORS& EQUIPMENT IN GEN YARD
- El Romero Solar Plant Atacama
- Rio Bravo Wind Farm Texas
- The Fowler Ridge Wind Farm Indiana
