Ocean Protection Plan Depot Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Work under this Contract includes, but is not limited to, the demolition of existing building and construction of new Ocean Protection Plan Depot. WORK SEQUENCE .1 Demolition and Construction of all buildings are to be carried out in in the following sequence: Phase 1: Demolition of existing building. Phase 2: Construction of new Ocean Protection Plan Depot. Exact construction period of each phase
- Status
- Prospective
- Sector
- Commercial, Warehouse, Manufacturing (Industrial), Seaport
- Location
- Port Hardy, British Columbia, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ocean Protection Plan Depot Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Work under this Contract includes, but is not limited to, the demolition of existing building and construction of new Ocean Protection Plan Depot. WORK SEQUENCE .1 Demolition and Construction of all buildings are to be carried out in in the following sequence: Phase 1: Demolition of existing building. Phase 2: Construction of new Ocean Protection Plan Depot. Exact construction period of each phase to be referred to Section 01 11 55 General Instructions Clause 1.4. .2 Do not close off usage of... |
Procurement method |
Location
Country | Canada |
State | British Columbia |
City | Port Hardy |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Warehouse, Manufacturing (Industrial), Seaport |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
