Oceanlinx 1MW Commercial Wave Energy Demonstrator
Sector: Commercial • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
(Project closed 20 June 2014) The Oceanlinx commercial wave energy demonstrator is a 3,000 tonne structure measuring approximately 21 metres wide by 24 metres long. The device was designed to sit in shallow water, using oscillating water column (OWC) technology to generate 1MW peak output.Project innovationThe Oceanlinx patented OWC and air turbine technologies were combined in Oceanlinx’s greenWA
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | (Project closed 20 June 2014) The Oceanlinx commercial wave energy demonstrator is a 3,000 tonne structure measuring approximately 21 metres wide by 24 metres long. The device was designed to sit in shallow water, using oscillating water column (OWC) technology to generate 1MW peak output.Project innovationThe Oceanlinx patented OWC and air turbine technologies were combined in Oceanlinx’s greenWAVE device, designed to be a highly efficient energy converter with no moving parts under water. As waves rise within the OWC, it was designed to drive a column of air ahead and through a turbine to generate electricity.In February 2014, construction of the device was complete and it was intended to transport the device from Port Adelaide to Port McDonnell for grid connection and 12 months operation and testing. Transportation occurred on 1 March 2014 and was expected to take approximately four days.On 2 March 2014, complications were experienced during transportation of the device, 24 hours into the operation. The device was set down in shallow waters off the Fleurieu Peninsula in South Australia. As a result of the transportation complications, the device was damaged beyond repair.ARENA is investigating lessons learned from this project to share with the industry and state and federal governments. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |