IFC is considering providing a loan to OCL, an existing IFC client, to part finance establishment of a 1.35 million tons per annum (mtpa) stand alone cement grinding plant at Kulapachuria village, Salboni Block, West Medinipur in the Indian State of West Bengal (the “Project”).The Project will utilize clinker from OCL’s existing cement plant at Rajgangpur, Orissa. The plant will manufacture 100% P

Project Information FAQ

Project Information

4 Q
The project “OCL India Limited II” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

IFC is considering providing a loan to OCL, an existing IFC client, to part finance establishment of a 1.35 million tons per annum (mtpa) stand alone cement grinding plant at Kulapachuria village, Salboni Block, West Medinipur in the Indian State of West Bengal (the “Project”).The Project will utilize clinker from OCL’s existing cement plant at Rajgangpur, Orissa. The plant will manufacture 100% Portland Slag Cement (PSC) to suit the market needs with an option to manufacture Portland Pozzolana Cement (PPC) or Ordinary Portland Cement (OPC) at a later stage depending upon market demand. Clinker will be transported by rail from Rajgangpur while coal/slag/fly ash/gypsum will be transported by road. Cement will be dispatched both by road and rail. The Project is expected to take 27 months to construct and thus be operational by January 2014. The Project includes construction, installation, operation and maintenance of various facilities including: a vertical roller mill; coal fired hot air generator; coal crusher; cement packing machine; a cement loader; clinker silo; slag stockpile with stacker and reclaimer; covered coal storage; cement silos; fly ash silos; gypsum storage; utilities (a water treatment, wastewater and sewage treatment plant, diesel generator for backup power and fire fighting system). In addition, a1 km access road is required along with a 6.25 km transmission line for the supply of power from the grid and a proposed township with about 50 houses for employees.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data