OCP Solar #2
Sector: Solar • Location: Morocco
Source: IFC Project Disclosures
OCP SA (“OCP” or the “Company,” ) plans to design, install and operate greenfield, captive solar power plants at two of the Company’s phosphate mines in central Morocco, with a cumulative installed capacity of 400 MWp including at least 100 MWh of battery storage. The Project is part of an effort from OCP to achieve 100% of green energy.
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Energy Storage, Fertilizers
- Location
- Morocco
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about OCP Solar 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | OCP SA (“OCP” or the “Company,” https://www.ocpgroup.ma/) plans to design, install and operate greenfield, captive solar power plants at two of the Company’s phosphate mines in central Morocco, with a cumulative installed capacity of 400 MWp including at least 100 MWh of battery storage. The Project is part of an effort from OCP to achieve 100% of green energy. |
Original sector | G-DB - Phosphatic Fertilizer |
Location
Country | Morocco |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Energy Storage, Fertilizers |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
