logo

OCWD Ground Water Replenishment System

Sector: Commercial • Location: Fountain Valley, California, United States

Source: McCarthy Building Companies

Project
Completed

Dubbed by project officials as the world’s largest wastewater purification facility of its kind, the Orange County Water District Ground Water Replenishment System now treats up to 100 million gallons of wastewater per day. For this expansion and modernization of the original 30-million-gpd plant, McCarthy updated an existing microfiltration facility and added eight new below-grade treatment basin

Project Information FAQ

Project Information

4 Q
The project “OCWD Ground Water Replenishment System” is an infrastructure initiative in the Commercial sector, located in Fountain Valley, California, United States. Taiyo aggregates data on it from McCarthy Building Companies.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Dubbed by project officials as the world’s largest wastewater purification facility of its kind, the Orange County Water District Ground Water Replenishment System now treats up to 100 million gallons of wastewater per day. For this expansion and modernization of the original 30-million-gpd plant, McCarthy updated an existing microfiltration facility and added eight new below-grade treatment basins. Crews also constructed a new 32,000-square-foot reverse osmosis building and added energy recovery devices to the system. Also built was a pair of 215-foot-diameter, 35-foot-tall, above-ground steel tanks that hold 7.5-million gallons of water each. Each segment of the massive water purification system required a different dewatering process, designed and installed based on the conditions and movement of water for that location. This required the team to work with internal and external experts to understand the subterranean conditions and implement systems to effectively remove water from excavation sites. Because the existing water facility remained fully operational during the expansion, the project team coordinated closely with the water district to minimize the time the plant was offline. This proved to be a critical aspect of the project, considering California’s ongoing drought.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data