Odessa Public Transport

Sector: Government • Location: Ukraine

Source: European Bank for Reconstruction and Development (EBRD)

Project
Cancelled

The EBRD is considering financing the project consisting of (i) the reconstruction of approximately 16 km of tracks and related infrastructure in the city of Odessa. It will include: ii) the purchase of new trams and refurbishment of existing trams; iii) the modernisation of the tram depot; and iv) the establishment of regulatory relationship between the City and the public transport companies. Th

Project Information FAQ

Project Information

4 Q
The project “Odessa Public Transport” is an infrastructure initiative in the Government sector, located in Ukraine. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EBRD is considering financing the project consisting of (i) the reconstruction of approximately 16 km of tracks and related infrastructure in the city of Odessa. It will include: ii) the purchase of new trams and refurbishment of existing trams; iii) the modernisation of the tram depot; and iv) the establishment of regulatory relationship between the City and the public transport companies. The Transition Impact of the Project will come from the following components: OdesaMiskElectroTrans , City of Odesa The total project cost is up to EUR 72.2 million. EBRD intends to finance up to 50% of the project cost and the balance is expected to be financed by the European Investment Bank. Up to EUR 72.2 million. Categorised B/1 (2003). An environmental analysis of the proposed replacement of tram tracks and modernisation of tram depots, and an Environmental, Health and Safety (EHS) Audit of the Company practices and existing facilities were conducted by independent consultants in September 2009. The environmental analysis of the proposed investment identified that the project will bring about positive impacts in terms of providing reliable and environmentally friendly public transport as an alternative to unregulated private minivans and taxis. There will be temporary negative impacts, such as air emissions, increased noise and vibration levels and generation of construction of waste during the construction phase, which could be addressed through implementation of required mitigation measures. There might be some community safety issues as some tram tracks intersect many gateways from individual plants and facilities. An Environmental and Social Action Plan, containing required mitigation measures to bring the Company in compliance with the Ukrainian regulations and with environmental and social requirements of the Bank has been developed by the consultants and will need to be approved and implemented by the Company. The Plan will address the following environmental and social aspects of Company’s operations: 1. Establishment of an Environmental Management System; 2. Implementation of monitoring of air emissions, noise levels and soil contamination; 3. Improved waste management;     1.Development of a grievance mechanism for employees and passengers;     2. Development of a social programme for various passenger groups. A total of EUR 1.4 million of TC assistance is required to prepare, design and implement the Project. It will include: technical and environmental scoping and review of tram investments, IFRS Audit of the Company, public transport regulatory improvement for the city, strengthening of environmental protection capability, procurement, implementation support and contract supervision.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data