Odessa Upper Elementary Parking Lot Repair
Sector: Car parking • Location: Odessa, Missouri, United States of America
Source: Dodge
Contractor shall complete the project and provide all labor, materials, and equipment necessary for completion of the project. The scope of work for the project shall consist of parking lot repair and resurfacing, and includes all work necessary and identified in the Odessa Upper Elementary Parking Lot specification sheet (hereinafter referred to as the Specifications ), which are incorporated and
- Status
- Closed
- Sector
- Car parking, Commercial, Automotive, Government
- Location
- Odessa, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Odessa Upper Elementary Parking Lot Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor shall complete the project and provide all labor, materials, and equipment necessary for completion of the project. The scope of work for the project shall consist of parking lot repair and resurfacing, and includes all work necessary and identified in the Odessa Upper Elementary Parking Lot specification sheet (hereinafter referred to as the Specifications ), which are incorporated and made part of this Agreement by this reference as if fully stated herein. The scope of work shall... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Odessa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Automotive, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
