logo
ProjectClosed

ODRA RIVER BASIN FLOOD PROTECTION

Closed · Poland

Source: World Bank

The main development objective of the Project is to protect the population in the Odra River Basin against loss of life and damage to property caused by severe flooding. This would be achieved by (i) reducing the extreme flood peaks through storage in a dry polder on the Odra River just upstream of Raciborz town, enabling a reduction of the flood peak downstream of the reservoir and allowing bette

Status
Closed
Sector
Road, Water Supply and Storage, Rail, Waste Processing and Treatment, Government
Location
Poland
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about ODRA RIVER BASIN FLOOD PROTECTION

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ODRA RIVER BASIN FLOOD PROTECTION” is an infrastructure initiative in the Road sector, located in Poland. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main development objective of the Project is to protect the population in the Odra River Basin against loss of life and damage to property caused by severe flooding. This would be achieved by (i) reducing the extreme flood peaks through storage in a dry polder on the Odra River just upstream of Raciborz town, enabling a reduction of the flood peak downstream of the reservoir and allowing better control of the operation of the river system; and (ii) by increasing the flood carrying capacity of the Odra River channels through and around Wroclaw. The Project would protect more than 2.5 million people against flooding in several towns such as Raciborz, Kedzierzyn, Kozle, Krapkowice, Opole, Brzeg, Olawa and Wroclaw, and settlements in the three vovoidships of Slaskie, Opolskie and Dolnoslaskie. There are three components to the Project. Component A is the Construction of Raciborz Dry Polder which will be created on the Odra River not far from the border with the Czech Republic near the town of Raciborz to retain flood water. Total capacity o f the reservoir would be about 185 Mm3. Component B is the Modernization of Wroclaw Floodway System which is to be modernized by improving the flood protection dikes, capacity of the hydraulic structures, improving the capacity of the flood bypass channel namely Widawa River transfer. Component C is the Improving Flood Management, Monitoring and Evaluation, and Supervision of the Environmental Management and Resettlement Action Plans. In addition the component will include support to the flood forecasting, and implementation of ecological enhancement works in the Odra River channel. Component D is Project Management, Technical Assistance and Training which will support the Government in implementing the Project and prepare a follow-on project.

Original sector

FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Poland

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Rail, Waste Processing and Treatment, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project